Estimated delivery time 2 - 4 business days.
Estimated delivery time 2 - 4 business days.
Estimated delivery time: 2-7 business days.
Estimated delivery time: 2-7 business days.
Pwr sup. unit type | switched-mode | |
LED | ||
volatage source | ||
8.4W |
Estimated delivery time: 2-7 business days.
Power source for LED lights. Impulse power source Espe LNC2012CV. Terminal blocks under plastic covers at the ends of the transformer. The handy size enables installation, e.g. for collation. Comprehensive protections: overload OPP, overvoltage OVP, short circuit SCP, overheating OTP
Estimated delivery time 2 - 4 business days.
Power supply for LED lights. Impulse power transformer Espe LNB1212CV. Terminal blocks under plastic covers at the ends of the transformer. The handy size enables installation, e.g. for collation. Comprehensive protections: overload OPP, overvoltage OVP, short circuit SCP, overheating OTP
Forssan Huoltopalvelu Ltd does not take any responsibility for accidents occurring in the installation of products or damage caused by incorrectly installed products. The installation of any electronic spare part has to be installed by a professional person with electrical permits required by law professional. If an electronic component is installed by a person without electrician degree or needed permits the customer is responsible for any possible accidents / damage. Electronic spare parts have no right of return if they have been tested in place on the device.
Estimated delivery time: 4-10 business days.